Kadao Ghat Indore 2012: Redevelopment of Kadao Ghat and Bridge
- Aniruddh Jain
- Feb 26, 2023
- 1 min read
PROJECT LOCATION Ganghot Ghat- Zone 3 Ward- 50- Indore (M.P.)
PROJECT COST
INR 127.33 Lacs. / USD 1,69,940.67
SCOPE OF WORK The development of the area has been divided into following subheads:
Landscaping the whole area
Conservation of the ancient temples
Construction of RCC retaining wall
Construction of a gateway to the area in relation to the existing bate gateway of the Lal Bagh Palace
External lighting (night illuminations)
Water huts
Toilet block
Police post (help desk)
Shoe stores
Florists/ Pooja materials shops
Development of sitting areas
Fountains to add to the beauty of area
Developments of the pathways parking lots
Excavating the Ganesha temple which is 20 feet below earth







Comments